 |
550-ton Truss Bridge
550-ton truss bridge over the Illinois River. Jacked down onto barge for removal and demolition. The span was lowered 50 ft. in less than 2.5 hours, greatly reducing the down-time for river traffic.
Contractor: Shappert Engineering Company
Location: Ottawa, Illinois, USA |
|